 E-Mail:info@lenotank.com    |     Phone: +86-18957741100
Language

Use and maintenance of batching tank

Views: 753     Author: LENOTANK     Publish Time: 2025-09-24      Origin: Site

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

To ensure proper operation and maintenance of the equipment:

1. **Pressure Check**: The equipment operates at normal pressure. If pressure is excessive, inspect the inlet and outlet for blockages.

2. **Oil Maintenance**: Use 40#-50# engine oil or 70#-90# extreme-pressure industrial turbine oil for the reducer. Replace the oil and clean the oil tank after the first 20 days of 8-hour daily operation, then every 3-5 months thereafter.

3. **Condenser Cleaning**: If a condenser is installed, clean the heat exchange piping based on its performance.

4. **Loading Limits**: Do not exceed the effective volume of the mixing tank to avoid motor burnout or damage to components.

5. **Extended Downtime**: When not in use for extended periods, clean, lubricate, and disconnect the power supply to maintain equipment integrity.

Each tank is crafted from premium-grade stainless steel, ensuring exceptional corrosion resistance, hygiene, and longevity.
Get In Touch
At the core of our business is a commitment to customer satisfaction.
Follow Us
Main Products
Copyright© 2025 WenZhou Leno machinery Co., Ltd. All Rights Reserved.