Views: 701 Author: LENOTANK Publish Time: 2025-09-30 Origin: Site
1. **Product Overview**
- **Model and Name**: RSCG01-1 Ultra-High Temperature Instantaneous Sterilizer
- **Applications**: Sterilizes fluid materials like milk, juice, beverages, alcohol, soy syrup, and pharmaceuticals.
2. **Specifications**
- **Capacity**: 1 m³/h
- **Sterilization Temperature**: 115–135°C
- **Steam Pressure**: <0.78 MPa
- **Heating Time**: 4–6 seconds
- **Feed Temperature**: <45°C (with cooling tube)
- **Discharge Temperature**: <65°C
- **Steam Consumption**: <0.15 kg/L
- **Motor Power**: 1.5 kW (single pump), 3 kW (dual pumps)
- **Weight**: 410 kg
- **Floor Area**: 0.9 m²
3. **Structure and Principle**
- **Main Components**:
- High-temperature barrel (pressure vessel)
- Spiral double-tube for heat exchange
- Spiral single-tube for heat reception
- **Process**:
- Material is preheated, sterilized, and cooled through heat exchange in coils.
- Adjustable discharge temperature via valves.
- Steam pressure and flow rate are controlled for optimal sterilization.
4. **Installation**
- Place on a flat workshop floor without a foundation.
- Adjust support bolts for stability and ensure pump shaft is horizontal.
- Use a 0.78 MPa safety valve at the steam inlet.
- Test user-connected piping to 14.7 MPa for homogenizer use.
5. **Operation**
- **Pre-Use Checks**:
- Inspect safety valves, pressure gauges, and flow paths.
- Ensure the storage tank is full and discharge flow is directed correctly.
- **Normal Operation**:
- Start with water circulation to test the system.
- Introduce steam, adjust sterilization temperature, and begin material processing.
- Control back pressure and discharge temperature using valves.
- **Abnormal Operation**:
- Use clean water to flush the system during material interruptions.
- Circulate water to prevent clogging during extended stops.
6. **Cleaning**
- **Procedure**:
- **Water Washing**: Remove residual material.
- **Alkaline Washing**: Dissolve proteins and fats with 2% NaOH solution at 80°C.
- **Water Rinse**: Clean off alkaline solution.
- **Acid Washing**: Remove scale with 2% nitric acid solution at 80°C.
- **Final Rinse**: Ensure no acid residue remains.
- **Precautions**:
- Avoid chloride-based detergents.
- Use purified water if local water quality is poor.
7. **Maintenance**
- Regularly inspect steam traps, safety valves, and gauges.
- Clean and lubricate feed pump bearings annually.
- Prevent freezing in winter by draining water or using 1% alkali solution.
- Check pipe joints and valves for leaks and tighten as needed.
8. **Troubleshooting**
- For sudden power outages:
- Close steam valves and drain condensate.
- Introduce tap water to prevent coking and fouling.
- Resume production by draining water and reopening steam valves.