**How to Install a Stainless Steel Reactor**
Proper installation of a stainless steel reactor ensures optimal performance and extends its service life. Follow these steps carefully:
1. **Placement:**
- Install the reactor indoors, ensuring good ventilation.
- For multiple reactors, separate them and provide each with a direct exit to the outdoors or a passageway.
2. **Autoclave Cover Installation:**
- Avoid collisions between the autoclave body and cover.
- Place the cover carefully on the body and tighten the main nuts symmetrically in steps to ensure an even seal.
3. **Threaded Connections:**
- Only rotate the nuts at forward and reverse connections; avoid rotating the arc-shaped sealing surfaces.
- Lubricate all threaded connections during assembly.
4. **Needle Valve Sealing:**
- Gently turn the valve needle to compress the sealing surfaces for an effective seal.
5. **Rotor Check:**
- Manually rotate the rotor to ensure smooth operation.
6. **Controller Placement:**
- Place the controller on a flat surface in an environment with:
- Temperature: 10–40°C
- Relative humidity: <85%
- No conductive dust or corrosive gases.
7. **Pre-Operation Checks:**
- Inspect movable parts, fixed contacts, and connectors for looseness or damage.
- Ensure the reactor is free from rust or transport-related damage.
8. **Post-Operation Steps:**
- Cool the reactor naturally or with water, then release pressurized gas to normalize pressure (gauge reads zero).
- Loosen the main nuts evenly, remove the cover, and place it on a stand.
By following these steps, the reactor will be safely and effectively installed for optimal use.