Colloid mill installation, use and maintenance precautions

Views: 700     Author: LENOTANK     Publish Time: 2025-09-30      Origin: Site

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

1. **Installation and Setup**

- Place the milling mill on a flat concrete foundation, horizontally.

- Secure with anchor screws if required by operating conditions.

- Tighten all fastening screws, especially the rotor center screw (M12 left-hand screw).

- Rotate the rotor with a dedicated wrench to check for contact with the stator or jamming before use.

2. **Power and Cooling Setup**

- Connect to a three-phase AC power supply (380V) with proper grounding.

- Ensure the rotor rotates clockwise as indicated by the arrow on the base.

- Turn on the cooling water supply, following the inlet and outlet markings.

3. **Startup and Operation**

- Start the motor and check for noise or vibration. Shut down immediately if abnormalities occur.

- Clean residual material from the stator and rotor while the machine is running, rotating the large chuck counterclockwise by at least 90° before cleaning.

4. **Stator/Rotor Clearance Adjustment**

- Adjust clearance while the machine is running:

- Loosen handles, rotate the large chuck clockwise to decrease clearance (finer particles), or counterclockwise to increase clearance (coarser particles).

- Tighten handles simultaneously after adjustment.

- Use limit screws to set the desired clearance based on material particle size.

5. **Maintenance and Cleaning**

- Regularly oil the oil cup.

- Clean the machine interior after use or non-use periods to prevent corrosion.

- Use appropriate cleaning agents without damaging nitrile rubber seals.

- Ensure seals are not damaged, misplaced, or lost during disassembly and assembly.

6. **Material Processing Requirements**

- Only process wet materials; dry solid materials are not allowed.

- Remove debris and ensure particle size is less than 1 mm and hardness does not exceed HV309.

- Avoid hard objects like iron or stone to prevent machine damage.

7. **Pulley Replacement**

- Loosen the nut on the motor cover and adjust the motor to loosen the triangular belt.

- Replace the pulley by gently tapping it with a hammer.

- Secure the new pulley, tighten the belt, and replace the motor cover.

Each tank is crafted from premium-grade stainless steel, ensuring exceptional corrosion resistance, hygiene, and longevity.
Get In Touch
At the core of our business is a commitment to customer satisfaction.
Follow Us
Main Products
Copyright© 2025 WenZhou Leno machinery Co., Ltd. All Rights Reserved.